tunnel doorniksewijk

The tunnel was created by SumProject. Constructing the cycling and walking paths at a level that is higher than the road results in a gentler incline and affords cyclists and walkers a permanent view. All the passages are covered as little as possible so that daylight gives users a feeling of safety. The walls are covered with bluestone and thus the tunnel blends in perfectly with the choice of materials used in the renovated city centre.

50.8255821, 3.2674461